A complete factory substructure: 4.9 km of 500 mm bored piles, excavation to 10 m behind shore protection, steel bracing and sheet piling, and pile load tests.
Scope of works
Substructure package & load tests
A complete factory substructure: 4.9 km of 500 mm bored piles, excavation to 10 m behind shore protection, steel bracing and sheet piling, and pile load tests.
Substructure package & load tests
Project photographs coming soon
We are glad to visit your site, review the drawings and propose the right method for your ground conditions, schedule and budget.